Last update on 30.01.2021 15:13
Find out contracts, concession companies and funding sources
Database of concession projects and Public Private Partnerships signed by the Albanian government during the period 2004-2020.
The concession contract was concluded between the Ministry of Energy and Industry and the concession company Shushica Hydropower shpk, which is a temporary merger of GR Albania shpk, Trema Engineering 2 shpk and Alb - Star shpk.The object of the contract is: financing, design, construction, commissioning, administration, maintenance of hydropower plants HPP Drashovica, HPP Kote, HPP Gjorm and HPP Brataj in the catchment area of the river Shushica, Vlora region. At the end of the concession period, the facilities will be transferred to the Contracting Authority.
Trema Engineering 2 - 33% of the sharesGR Albania - 33% of the sharesAlb - Star - 34% of the shares